Free Trial

All Winter Slots at Inkoo LNG Terminal Have Been Allocated

LNG

All available spot slot capacity for the period between 14 December and 6 April 2023 at the Inkoo LNG have been reserved during the latest capacity allocation round according to Gasgrid.

  • All slots allocated will be under temporary Joint Use Rules approved by the Energy Authority applying Joint use for the full period. Slots will also be invoiced on actual discharged cargo quantity for this period to aid operational predictability and flexibility for the winter period, Gasgrid said.
  • Gasgrid put the reservation status for the terminal on hold on 9 October following the shutdown of the Balticconnector pipeline on 8 October.
  • Since the shutdown of the pipeline, two cargoes arrived at the terminal.

To read the full story

Close

Why MNI

MNI is the leading provider

of intelligence and analysis on the Global Fixed Income, Foreign Exchange and Energy markets. We use an innovative combination of real-time analysis, deep fundamental research and journalism to provide unique and actionable insights for traders and investors. Our "All signal, no noise" approach drives an intelligence service that is succinct and timely, which is highly regarded by our time constrained client base.

Our Head Office is in London with offices in Chicago, Washington and Beijing, as well as an on the ground presence in other major financial centres across the world.