February 10, 2025 17:05 GMT
POWER: Fingrid Confirms Connection to Picasso Platform on 26 March
POWER
Fingrid will connect to the PICASSO trading platform on 26 March 2025, after overcoming technical challenges, it said.
- This connection will expand Finland's aFRR energy market, facilitating cross-border trading with neighbouring transmission system operators like Estonia’s Elering.
- aFRR energy trading will use the 350MW Estlink 1 connection, with available transmission capacity allocated dynamically based on system limitations, Fingrid added.
- Additionally, the PICASSO trading platform will not reserve transmission capacity, but will instead use the available capacity at the time of use.
78 words