September 20, 2024 13:32 GMT
POWER: Works at the 1GW FR-UK Power Link Extended One Week
POWER
The unplanned outage at the 1GW FR-IFA2 link between the UK-FR will now return on 27 Sep – a week later than expected, latest Remit data show.
- The UK-French power link was disconnected on 5 Sept and was anticipated to return on 20 Sept. No capacity is available in both directions.
50 words