August 21, 2024 10:17 GMT
POWER: Equinor, Polenergia Recieve All Permits for 1.44GW Offshore Wind Farm
POWER
Equinor’s and Polenergia 720MW Baltyk II and 720MW Baltyk III offshore wind farms have acquired all the necessary permits to start construction, CEO of Polenergia Jerzy Zan said, cited by ISB News.
- The permits are for the installation of 100 offshore wind turbines.
- Baltyk II and Baltyk III are to be launched in 2027.
- Orsted and PGE are also eying the start of their 1.5GW Baltica 2 project for 2027, with the EBRD currently assessing funding for the project.
76 words